Skip to main content

Activating a Project

  1. Open the project dashboard (by selecting it from the Projects page)
  2. Click the “Run” button to enable test takers to take tests
  3. The project is now in a running state, and anyone can use the shareable test link

Stopping a Project

  1. Click the “Stop” button on a running project to prevent new and existing test takers from using a test link
  2. Click to confirm to verify the change
  1. Click “Share Test” button
  2. Share the link or QR Code to allow test takers to self-enroll Show Link and QR Code
Test takers can scan the QR code to access a test in the same way a link is clicked. To share this QR code, you can right click it and save the image to your computer. This allows you to attach it to emails, text messages, or other communications.
If a test taker does not receive a confirmation code when they are self enrolling for a test, encourage them to check their junk email folder.

Sending a Test Immediately

Send a test to a specific test taker immediately from the project page.
  1. Click the three ellipses button in the test taker table row for that test taker.
  2. Click “Send Test” Click Send Test
People from an integration such as Platform Science start assessments there, so Send Test is not available for them. See Platform Science.
If your organisation uses its own messaging system (SMS platform, HR portal, intranet, or similar), you can copy a direct test link for a specific test taker and paste it wherever you need.
  1. Click the three ellipses button in the test taker table row for that test taker.
  2. Click “Copy Link”. Click Copy Link
  3. The link is now on your clipboard. Paste it into your communication system.
The copied link is personalised to that test taker. Anyone who receives the link can complete the test on their behalf. Do not share it publicly or with the wrong person.
“Copy Link” and “Send Test” are both available from the same menu. Use “Send Test” if you want Neurapulse to deliver the invitation by email or SMS. Use “Copy Link” if you want to send the invitation yourself through a different channel.

Manually Verifying a Test Taker’s ID

If a test taker could not complete digital ID verification, their status shows Verification pending and they cannot start the test until you verify them.
  1. Click the three ellipses button in the test taker table row for that test taker.
  2. Click Manually Verify ID.
  3. Confirm that you have verified their identity through an approved manual method (for example, an in-person ID check).
This attests their identity and sends them a fresh test. That attempt is recorded as Verified (manual).

Managing Test Access

  • Active Projects: Test links are valid when the project is running
  • Inactive Projects: Test links are disabled when the project is stopped
To pause testing, click “Stop” on the project dashboard. This will temporarily lock out test takers from running tests from the test link or scanned QR Code.